Brighton
June 2026

Chimney Stack Removal Below Roof Level & Re-Tiling — Brighton

Chimney stack demolished below roof level on a Brighton property — void reframed with new rafters, breathable felt and battens installed, then tiled over with running sand and cement to the ridge.

Project Details

On this Brighton property the chimney stack was no longer required and had become a maintenance liability. Rather than patch the existing stack, the decision was taken to remove it entirely below roof level — the correct and permanent solution. The void was then reframed, felted, battened, and tiled over with the ridgeline finished in running sand and cement.

Demolition

The stack was demolished course by course below the roof line, with the surrounding tiles carefully stripped back to give clear access to the full footprint of the stack. The flue liner was removed and all debris cleared from the void before any new work began. This stage is critical — the new timber frame and tiling have to be built off a completely clean, level base.

Reframing

New rafters were cut and fitted across the void to match the existing roof pitch and spacing. Each rafter was properly seated and fixed so the new section of roof behaves as one continuous structure rather than a patch. The existing rafters on either side were retained and tied into the new frame.

Felting, Battening & Tiling

Cromar Vent3 breathable underlay was laid across the void and lapped into the existing felt runs on either side, followed by tiling battens fixed at the correct gauge. Tiles were then hung to match the existing roof, with each course run through to give a seamless finish. The ridgeline was bedded in running sand and cement to complete the job.

The Result

Once the scaffold came down, the former chimney opening was completely invisible. The roof is now one uninterrupted plane — properly framed, felted, and tiled — with no ongoing maintenance requirement from a redundant stack.

Project Gallery

Scaffold erected and tiles stripped back on a Brighton property to expose the chimney stack at roof level — start of demolition works
Chimney stack demolished below roof level — old brickwork cleared away and existing rafters exposed across the void ready for new timbers
Flue liner exposed in the chimney void during demolition — void opened up fully across the width of the stack with new rafters positioned alongside
New softwood rafter fitted into the chimney void alongside the retained existing rafters — new timber sized and seated correctly to carry the tiling load
Breathable roofing felt and tiling battens being installed over the chimney void — felt lapped correctly into the existing felt runs either side
Cromar Vent3 breathable membrane fully laid and battened across the chimney void area — ready for tiles to be hung, ridge line set above
Chimney void area tiled over and blended into the surrounding roof — new tile courses run to the ridge with sand and cement applied to the ridgeline
Completed chimney stack removal with scaffold struck — roof reinstated with no visible trace of the former stack, ridge line clean and weathertight

Frequently Asked Questions

Why remove a chimney stack below roof level rather than just capping it?

Capping a stack leaves the brickwork exposed to weathering above the roof — it still needs maintenance, the flashings can still fail, and the stack can still deteriorate and cause problems. Removing below roof level eliminates all of that permanently. The roof is tiled over and there is nothing left to maintain or waterproof.

Do you need planning permission to remove a chimney stack?

In most cases, removing a chimney stack below roof level is covered by permitted development rights and does not require planning permission. However, if the property is listed or in a conservation area, consent may be required. We advise checking with the local planning authority before starting work if there is any doubt.

What happens to the flue inside the house?

Once the stack is removed below roof level, the flue opening in the loft is sealed off. If there are open fireplaces below, those can either be blocked off or left with a vent to prevent damp from an unventilated void — that is a decision for the homeowner, usually handled at the same time as the roof works.

What is running sand and cement for a ridge?

Running sand and cement is the traditional method of bedding and pointing ridge tiles — a mortar mix is applied beneath each ridge tile and then pointed along the joints to seal the ridgeline against the weather. It is the standard finish for a tiled roof ridge and, when done correctly, is highly durable.